001 - KLNSYS - Budapest
Plant Profile
Energy and Power
Plant overview
Energy and power
Specific yield
Specific yield of the 4 Plants
inverter AC power
DC CHANEL A & B VOLTAGE
AC CURRENT & VOLTAGE
Daily report
Monthly report
Yearly report
pictures
more pictures
1.STAMENCO (koropi:97,02 kW) Plant Profile
Location:
KOROPI-ATTIKA (http://stamenco.gr/ΦΒ-Πάρκο-Κρωπίας.php), Greece
Operator:
STAMENCO spa
Commissioning:
8/15/2008
System power:
97.02 kWp
Annual Production:
approx. 149,120 kWh (1,537 kWh/kWp)
CO2 avoided:
Approx. 104.4 tons per annum
Modules:
Schüco S 165-SP
Inverter:
21 Sunny Boy 4200TL HC
Communication:
Sunny WebBox
Description:
STAMENCO
's first PV Plant in the Koropi area, Attika. The 588 polycrystalline panels and the 21 inverters that are installed are from SCHUECO and SMA co., respectively supplied and delivered via Data Energy co. The same company was also responsible for the installation. The overall study, design and technical supervision was held by Dr.Ing.K.Michailidis
Πρώτο Φ/Β Πάρκο της ετ.
STAMENCO
στην περιοχή Κορωπίου,Αττικής.Χρησιμοποιήθηκαν 588 πολυκρυσταλλικά Πλαίσια της ετ.SCHUECO και 21 αντιστροφείς της ετ.SMA.Η συνολική μελέτη και τεχνική επίβλεψη πραγματοποιήθηκε απο τον κ. Κ.Μιχαηλίδη,Δρ.Ηλεκτρολόγο-Ηλεκτρονικό μηχανικό,η προμήθεια & εγκατάσταση του εξοπλισμού από Data Energy Α.Ε.
© 2010 SMA Solar Technology AG |
Home
|
Information
|
User Manual
|
FAQ
|
Terms of Use
|
Legal Notice